D'Piazza Condominium Progress Update 27.6.2009

Top Floor of block C

Zoom in for Block D External Finishing (window use clear glass)

Photo show the Block D unit Workdone

Block C in left and Block D in right

Top floor of Block D

Block D lower floor

Whole Block D in view

block B Aluminium door and window installation in progress

Upper level of Block B

Fencing of D'Piazza

Top of fencing column decorative work

Decorative fencing column -This one better and nice

Finishing work at front of swimpool for Blk A,B & C

Block C in rear side and Block B in front side

Road at the centre split the Block D and Blk ABC.

Full view of Blk D facing Blk ABC

External wall complete with paint at front side of Blk D

blk D view

Guard house for blk ABC in progress

DPiazza Mall Logo

Plastering work in progress at blk B

Blk B plastering work zoom in view

Blk B view

Blk D view

Blk C facing swimming pool view